Wing session
Finished riveting up the left wing fuel tank.
Finished riveting up the left wing fuel tank.
I worked on preparing the left fuel tank for final riveting and sealing.
I've finished riveting on the right wing
Tonight was a night of tiny projects. I was able to get all of the AN fittings installed into the left fuel tank. I was also able to get the landing and taxi light wired up and mounted into the right wing. Little project projects big progress!
I completed a aligning and final riveting of the right flap and the right on. I was amazed at how well they lined up with little to no effort!
I pulled the left tank off the wing and ran another bead of proseal around all the edges making sure to hit the corners heavily. That seems to be a problem area. I’ll let that all set up and install the internal plumbing… the fuel pickup, vent, and return lines. After that, I’ll rivet the back channel in. I’m hoping to have the tanks done by the time I leave for OSH. It’s unlikely though I’ll get to pressure testing the left tank as I want that to dry for a week or more. Fingers crossed I know what I’m doing now and there’s no leaks in tank two! #fueltank #wing
Finished riveting up the left side wing tank
I finished getting the internal skeleton of the left wing tank finished.
I got the left wing tank riveted up and fitted into the wing. The next step is clear drill all the holes take the wing tank back off of the wing and then seal it. Hopefully the ceiling will go better now that I know what the heck I'm doing.
Third round of chasing a tank leak! Also worked on dimpling the left tank skin. #fueltank
Continue to chase down the leak on the right wing tank. Also did some riveting on the top skin of the left wing. I decided to switch out the stock fuel senders for a set of CiES senders. https://ciescorp.net/ The are way easier to install and the company claims fuel accuracy to 1/10 of a gallon. They seem way more robust than the kit supplied units. #fueltank
Today was a pretty substantial day. I got the Pio system all wired up and all the electrical wiring laid into the left wing. I was also able to build standoffs so the wires don't interfere with Peter tubes and vice versa. I should be ready to start closing up the left wing and installing the top wing skin this weekend. I'll also be able to retest the right fuel tank to see if I sealed up all the leaks. #wingskin
I got the end rib set in and clear drilled. And I fitted up the wing tip and got those holes drilled as well. Tomorrow I'll rivet the whole thing together.
I did some skin preparation and internal skeleton preparation for the left fuel tank
All the rivets on the bottom skin have been set up and just need to be pulled. That's the end of the session!
Worked in cleckoimg in and preparing the bottom skin for riveting.
I pretty much wrapped up the tank today. It was a continued gooey awful stinky nasty mess but it's done! The only thing I have to do with the tank is to attach some of the brackets on the rear side which involves a little bit more prose but not a lot. It's almost there! #fueltank
I cycled between sealing the tank and building the left aileron. Getting the tank together and sealed properly has been time consuming, tedious and messy but it needs to be done right. I have no desire to revisit a leaky tank!!
Getting all the parts dry fit and ready for the tank sealing process.
I was able to get the nose. Skin riveted onto the outer tip of the right wing. Next step is the fuel tank!
I finished reventing the bottom skin to the right wing
I got to a good spot to stop the riveting. About half of the bottom wing skin rivets are set and in place.
I finished dumping all of the bottom wing skins. Whoa! #riveting #wingskins
I installed half of the ribs mostly the ones from rib one to rib six to test fit. The next step is to begin riveting ribs one through six onto the main spa. #wing
I completed assembling all of the ribs for the right hand wing. I also prepared the other ribs that didn’t need assembly for attachment to the spa.
ID bird the majority of the real rear spa parts. The only thing left to do is to clean them and get the sticky label go off. And then we can Cleco the structure together.
Test routes the strobe wiring through the vertical stabilizer. Need to call Mid-west about the coax cable that also needs to run through to support the VOR antenna. #wiring #midwestpanel