← Back to full build log
Sling TSi · Peter B.5 OCT 2026
LOG ENTRY
094
DUR   2h 7m
Wing

Wing session

A difficult painting session. I shot the rudder and the vertical stabilizer with urethane primer. I also shot the elevator. The urethane was very thick and it splattered out initially. I ended up adding a healthy dose of reducer which made it flow out much much better. I think part of the issue may be that the urethane is really old and was stored out at the hanger for a while. Hoping it's OK in the long run.