← Back to full build log
Sling TSi · Peter B.25 JUL 2026
LOG ENTRY
075
DUR   3h 17m
PHO   4 photos
Wing

Wing session

For the first session today, there were a lot of little tiny projects. I'm preparing the left tank for pressure testing. I'm also going around and doing the little jobs like riveting in ribs and other things that are required to wrap up the wing build

Gear used here