← Back to full build log
Sling TSi · Peter B.12 JUL 2026
LOG ENTRY
069
DUR   2h 55m
PHO   4 photos
Wing

Wing session

I pulled the left tank off the wing and ran another bead of proseal around all the edges making sure to hit the corners heavily. That seems to be a problem area. I’ll let that all set up and install the internal plumbing… the fuel pickup, vent, and return lines. After that, I’ll rivet the back channel in. I’m hoping to have the tanks done by the time I leave for OSH. It’s unlikely though I’ll get to pressure testing the left tank as I want that to dry for a week or more. Fingers crossed I know what I’m doing now and there’s no leaks in tank two! #fueltank #wing

#fueltank#wing
12 JUL 2026 — Sling TSi Build Log | FL1