← Back to full build log
Sling TSi · Peter B.9 JUN 2026
LOG ENTRY
042
DUR   5h 27m
PHO   4 photos
Wing

Starting on the left aileron while the tank pro seal dries.

I cycled between sealing the tank and building the left aileron. Getting the tank together and sealed properly has been time consuming, tedious and messy but it needs to be done right. I have no desire to revisit a leaky tank!!