LOG ENTRY
042
DUR 5h 27m
PHO 4 photos
Starting on the left aileron while the tank pro seal dries.
I cycled between sealing the tank and building the left aileron. Getting the tank together and sealed properly has been time consuming, tedious and messy but it needs to be done right. I have no desire to revisit a leaky tank!!