LOG ENTRY
014
DUR 1h 24m
Wing session
I installed half of the ribs mostly the ones from rib one to rib six to test fit. The next step is to begin riveting ribs one through six onto the main spa. #wing
#wing
I installed half of the ribs mostly the ones from rib one to rib six to test fit. The next step is to begin riveting ribs one through six onto the main spa. #wing