← Back to full build log
Sling TSi · Peter B.7 JUL 2026
LOG ENTRY
065
DUR   2h 23m
PHO   2 photos
Wing

Wing session

I got the left wing tank riveted up and fitted into the wing. The next step is clear drill all the holes take the wing tank back off of the wing and then seal it. Hopefully the ceiling will go better now that I know what the heck I'm doing.

7 JUL 2026 — Sling TSi Build Log | FL1