← Back to full build log
Sling TSi · Peter B.23 APR 2026
LOG ENTRY
002
DUR   31m
Vertical Stabilizer

Vertical Stabilizer session

Test routes the strobe wiring through the vertical stabilizer. Need to call Mid-west about the coax cable that also needs to run through to support the VOR antenna. #wiring #midwestpanel

#wiring#midwestpanel
23 APR 2026 — Sling TSi Build Log | FL1