← Back to full build log
Sling TSi · Peter B.13 JUL 2026
LOG ENTRY
071
DUR   1h 32m
PHO   4 photos
Wing

Wing session

Tonight was a night of tiny projects. I was able to get all of the AN fittings installed into the left fuel tank. I was also able to get the landing and taxi light wired up and mounted into the right wing. Little project projects big progress!

13 JUL 2026 — Sling TSi Build Log | FL1